Schedule Fatigue Risk Analyzer

While analyzing compliance tells you who could work, the Schedule Fatigue Risk Analyzer™ tells you who should.

Instantly determine if a shift schedule, overtime assignment, shift swap or proposed FRMS exemption is creating excessive and costly fatigue risk.

The system can be interfaced with your time and attendance system or can be accessed via web-links to provide real-time advice to your schedulers and dispatchers.

Schedule Risk Analyzer

Flexibility of the Cloud

The CIRCADIAN Schedule Fatigue Risk Analyzer can be accessed from anywhere by secure web-links or can be integrated via XML transfers with your time and attendance system.

Employees: Use Web-accessible system to make sure that any proposed shift swap or overtime assignment does not create excess fatigue risk before requesting the change and wasting the time and resources of the scheduling department, dispatcher or manager.

Schedulers: Upload individual schedule or batch of employee schedules to check for fatigue risk either directly interfaced with scheduling screen (XML secure transfer) or by uploading into web interface.

Managers: Track Fatigue Risk Management System performance to determine how to optimize staffing efficiency while controlling for excess fatigue risk.

Compliance Does Not Prevent Fatigue


You can be compliant with FRMS “Hours of Service” while being at very different levels of fatigue risk. The Schedule Fatigue Analyzer enables the risks and costs of fatigue to be tracked, reduced and managed.

Sign up for a complimentary 30-day trial to 
Schedule Risk Analyzer™

To learn more about the Schedule Fatigue Risk Analyzer, please:

  • Call us at 781-439-6300
  • Email This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Fill-out the contact form by clicking here

Home  |  Privacy Policy  |  Terms of Use  |  Sitemap  |  Contact Us

Subscribe to our newsletter!



Contact Information
Phone: 1.800.284.5001
Local: 1.781.439.6300


Circadian Headquarters
2 Main Street, Suite 310
Stoneham, MA, 02180, USA